Helium Research Center internal report
design of interchanger for determining the ratio of Cp mixed to Cp unmixed in the helium-nitrogen system
Our rough guess is there are 19,250 words in this book.
At a pace averaging 250 words per minute, this book will take 1 hours and 17 minutes to read. With a half hour per day, this will take 3 days to read.
How long will it take you?
This book will take an estimated to read at a reading speed averaging words per minute. With 30 minutes per day, this will take to read.
Enter your reading speedYou can take one of our WPM reading speed tests to find your reading speed.
Create a free account to track your reading progress, build your reading list, and set reading goals.
Author
Contributions
- United States. Bureau of Mines - Contributor
- Helium Research Center (United States. Bureau of Mines). Branch of Fundamental Research - Contributor
Publication
1964 - U.S. Department of the Interior, Bureau of Mines, Branch of Fundamental Research, Amarillo, Tex, Texas
Language
English
Word Count
19,250 words, Guess
Page Count
77 pages
Identifiers
- Internet Archiveheliumresearchce00bari_2
- OCLC Control Number915080018
- Open LibraryOL27329340M
Alternate Titles
- Bureau of Mines, Helium Activity, Helium Research Center Internal Report
- Design of interchanger for determining the ratio of Cp mixed to Cp unmixed in the helium-nitrogen system
Description
This report is concerned with the necessary mathematical equations in order to accomplish the following objectives: 1. to evaluate the parameters such that the sum of the weighted squares of the residuals of an experimental observable be a true minimum, regardless of the functional relationship between the variables and these parameters; 2. to evaluate all variances and covariances of the parameters evaluated by means of the law for the propagation of errors; and 3. to insure that a true minimum will always be obtained. The equations presented in this report were developed for a three-parameter problem.
Subjects
Series Statement
- Helium Research Center Internal Report / U.S. Department of the Interior, Bureau of Mines -- no. 58
- Helium Research Center Internal Report (United States. Bureau of Mines) -- no. 58.
Other Editions
- Helium Research Center internal report
Show 1 more editions
Reader Reviews
No reviews yet for this book.
Be the first to share your thoughts!