In-field performance of geosynthetics used to reinforce roadway base layers
phase I : instrumentation selection and verification : final report
Our rough guess is there are 40,000 words in this book.
At a pace averaging 250 words per minute, this book will take 2 hours and 40 minutes to read. With a half hour per day, this will take 6 days to read.
How long will it take you?
This book will take an estimated to read at a reading speed averaging words per minute. With 30 minutes per day, this will take to read.
Enter your reading speedYou can take one of our WPM reading speed tests to find your reading speed.
Create a free account to track your reading progress, build your reading list, and set reading goals.
Author
Contributions
- Lapeyre, Joseph A. - Contributor
- Montana. Department of Transportation - Contributor
- Montana State University (Bozeman, Mont.). Department of Civil Engineering and Engineering Mechanics - Contributor
Publication
1996 - Available through the National Technical Information Service, Bozeman, Mont., Montana
Language
English
Word Count
40,000 words, Guess
Page Count
160 pages
Identifiers
- Internet Archiveinfieldperforman1996perk
- OCLC Control Number35833207
- Open LibraryOL33178065M
Classifications
- DDC625.8
- LCCTE212 .P47 1996
Description
Research has been initiated by the Montana Department of Transportation to understand if and how geosynthetics can be used to reinforce roadway base course layers. This research, as currently planned, may involve the construction and monitoring of geosynthetically reinforced full-scale field test sections subject to real traffic loading. Stress, strain, moisture content and temperature sensors would be used to monitor performance of the test sections. The research is being conducted in phases. Initially, a literature review was conducted to establish a need for further research. With this need identified, the first phase of the research was initiated. This final report discusses the work performed under Phase I of the project. The objective of the Phase I research was to examine instrumentation proposed for use in the field test sections to be constructed under a subsequent phase of the project. This objective was accomplished by constructing a pilot test section with certain instruments placed on the geosynthetics and within the base course and asphalt concrete layers. These instruments were monitored for a 4 month period. Laboratory wide-width tension tests were performed on the geosynthetics used in the pilot test section for the purpose of comparing the measured strain from the instrument to the global strain experienced by the material. From this work, conclusions are made regarding the appropriateness of certain instruments and installation techniques for use in field test sections.
Subjects
Topics
Reader Reviews
No reviews yet for this book.
Be the first to share your thoughts!