Engineering report on the preliminary design of project improvements: south end project, project no. Mass. R-56.
Our rough guess is there are 18,500 words in this book.
At a pace averaging 250 words per minute, this book will take 1 hours and 14 minutes to read. With a half hour per day, this will take 3 days to read.
How long will it take you?
This book will take an estimated to read at a reading speed averaging words per minute. With 30 minutes per day, this will take to read.
Enter your reading speedYou can take one of our WPM reading speed tests to find your reading speed.
Create a free account to track your reading progress, build your reading list, and set reading goals.
Contributions
- Boston Redevelopment Authority. - Contributor
Publication
1965 - , Massachusetts
Language
English
Word Count
18,500 words, Guess
Page Count
74 pages
Identifiers
- Internet Archiveengineeringrepor00char
- Open LibraryOL23297503M
Description
...this report presents the results of engineering studies of the proposed infrastructure improvements to be undertaken in the South End urban renewal project; in general, the report provides the reader with the basic concepts of the preliminary design of proposed improvements to streets, parks, lighting, water distribution, sewerage, police and fire alarm, MA Bay Transit Authority (MBTA) facilities, and traffic control systems; also discusses signage (street, traffic and directional) and soil conditions; includes 5 stage timetable with cost estimates for each project improvement; a copy of this item was in the BRA collection...
Subjects
Topics
Reader Reviews
No reviews yet for this book.
Be the first to share your thoughts!